PROJECT:

MOUNT VERNON PLACE SIDEWALK INSTALLATION

CITY OF DUNWOODY

Project includes completion of concept, survey database and construction plans for the installation of a 6’ sidewalk to connect existing sidewalk along Mt. Vernon Place to another sidewalk project along Mt. Vernon Road. Curb and gutter will be installed and driveway aprons reconstructed to provide ADA accessibility. The sidewalk meanders around existing trees and utilities to reduce impacts. Storm drainage is captured in proposed catch basins to control gutter spread.

Mt Vernon Pl Layout.jpg
Cover Photo.JPG

PROJECT:

INTERSECTION IMPROVEMENTS

OF SR 140 AT SCOTT ROAD AND AVERY ROAD

CHEROKEE COUNTY, GA

Project includes completion of a traffic study, environmental screening, concept, survey database and construction plans for these intersections improvements. After completion of the traffic analysis to validate planning studies, the project intends to add a right turn lane from both T-intersections onto SR 140. The existing signal at Scott Road will be modified to accommodate the right turn lane and the project will also coordinate with the GDOT widening of SR 140 to provide a two-way left turn lane between these intersections.

PROJECT:

EROSION CONTROL INSPECTIONS FOR THE WIDENING AND RECONSTRUCTION OF SR 140 G.P.'S ENTERPRISES, INC. 

Project includes monthly site inspections of erosion control measures to ensure conformance to the Erosion, Sedimentation & Pollution Control Plan for this seven-mile GDOT widening project. After each inspection, a letter summary is provided to the client for submission to EPD.